HOUSE RENOVATIONS '05 - AFTER DEMOLITION

The following pictures were taken in June, just after the demolition phase of reconstruction took place.


Wooglin's Den Looking at the back door

Wooglin's Den Looking at the back door

Wooglin's Den Looking into the Dining Room

Wooglin's Den Looking into the Dining Room

Dining Room

Fireside Room

Fireside Room

Foyer

Underneath the "Up" Stairs (they're gone)

"Down" Stairs

Hallway- Foyer looking into Kitchen

Kitchen, what used to be the "Up" stairs in the background

Kitchen- Looking at entrance doorway

Former first floor bathroom

Storage Area behind Kitchen
 

Looking from the old kitchen storage area into the kitchen

Looking from the kitchen into the old storage area

"Up" stairs no longer there

Looking into the Kitchen from the old "Up" Stairs

Stairs to 3rd Floor

top

June 30, 2005

RENOVATION UPDATE

A quick update... The new "down" stairs have been completed. Working on the new "up" when I was there today. Should look pretty neat with the bench seat there. The kitchen floor has been leveled so the pantry matches the kitchen. Cabinets and countertops have been ordered. The new ceiling has been framed. The back apartment "breezeway" has been framed on both ends. The old framing in the hallway from foyer to kitchen has been removed. A majority of the electrical has been strung (as far as I can tell) The stained glass recess has not yet been started above the fireplace. Bob was going to try to get the framing approved by the building inspector middle of tomorrow if the stairs are done. It would appear as though we are moving forward! --

-Phil Adler
CIP chairman

 

Last updated: July 04, 2006