February 16, 2002

Photos of the EGHC Meeting

The following photos were taken during the Housing Corporation meeting that took place just prior to the Father/Son Euchre Tournament in 2002. These photos are also the last photos taken in the chapter house prior to it's closure in March 2002.

House Pictures


1. Third floor ceiling, open area now blocked off


2. New safety bars now installed between 2nd & 3rd floor

3. Looking down the hall on 2nd floor, Josh Tilley caught by surprise.

4. Composites on the wall on the other hall on 2nd floor

5. The soon to be study area on 2nd floor

6. Over looking the stair railing into the foyer

7. Looking into the formal room

8. Looking from the dining area into the formal room

9. Wooglin's den

10. DJ Booth in Wooglin's Den
  

Meeting Pictures


Tom Olver Prepares for the meeting

Profile of James Eschelbach, EGHC Treasurer

 

District Chief Willie Hilliker & Asst. Chapter Counselor Scott Sawyer

The Seebers

James & Phil Adler, EGHC VP

Paul "Bubba" Koehn

Josh Tilley Chapter VP, Ryan Gleason, Chapter President, James & Phil

July 27, 2002

Housing Corporation Meeting

The Housing Corporation met in July to discuss how to settle the chapter's debt and how to put the wheels in motion for recolonization in the fall of 2004.

Download the Meeting Minutes: Minutes - July 27, 2002

From the left - Mark Valchine II, James Eschelbach, Tom Olver, Phil Adler, Robert F. Seeber, Robert A. Seeber
From left: Mark Valchine II `03, James Eschelbach `99, Thomas Olver `98, Phil Adler `98, Robert F. Seeber `87 and Robert A. Seeber

October 1, 2002

814 S. Main - Continuous Improvement Project

By Phil Adler `98, EGHC Vice President

The capital improvement project at 814 S. Main is progressing very well. The second floor has been 99% completed allowing tenants to move into their rooms. All rooms now feature closets, cable and phone jacks in the wall, and drop ceilings with interconnected smoke detectors. The basement egress has been completed in the large room. Code enforcement hit us with a zinger while walking through the house. If we wanted to keep the basement rooms, we were required to install a sprinkler system in the furnace room as well as replace the furnace door with a solid core door and make a few other minor adjustments. These are currently being worked on.

The porch has a new railing that meets local codes. The pillar supporting the West most area of porch roof has been adjusted to provide appropriate support. The back door adjustment has been completed including the addition of the small deck up to the entrance.

All of the roofs have been completed. Matching shingles are located on each of the eaves and small roofs as well as the former tin porch roof. For the first time in fifteen years all of the shingles match! (Charcoal Gray) The final phase of this major renovation will take place this week as vinyl siding starts. It will be the same color “house gray” and feature siding style similar to the existing wood-work to keep the “look” to which we are  all accustomed.

This summer the house received a thorough cleaning and a fresh coat of paint on the first floor before the tenants moved in. A trend we hope to continue in the future. We instituted a check-in/check-out procedure this year to ensure accountability in our tenants. As always, the housing corporation is looking for volunteers to help in areas of lease management, continuous improvements project leaders, and members at large to help make important decisions regarding the physical structure of the house.

Hope to see you all at homecoming!

Photos from the renovation can be found on the main EGHC reports page.